Chilled water supply – Kenmore Coldspot 106 User handbook

Chilled water supply – Kenmore Coldspot 106 User handbook

Web Page 8

Read all instructions very carefully before beginning. ESSENTIAL;

If running the fridge before installing the water connection, turn ice manufacturer towards the OFF position to stop procedure without water.

All installments must certanly be prior to neighborhood plumbing work

Use copper tubing and check always for leaks.

Install copper tubing only in places where conditions will stay above freezing.

If can take as much as a day for your ice manufacturer to begin with ice that is producing.

Tools needed;

in. open-end wrenches or two adjustable

Hand drill or electric drill (correctly grounded)

Your fridge dealer includes a kit available with a

in. (6.35 mm) saddle-type shut-off valve, a union, and copper

tubing. Before buying, make certain a saddle-type valve

complies along with your neighborhood plumbing work codes. Don’t use a piercingВ­

in. (4.76 mm) seat valve which decreases water movement

and clogs more easily.

Chilled water supply

The ice manufacturer water valve includes a movement washer which will be utilized

being a water pressure regulator. The ice manufacturer has to be linked to a cool water line with water stress between 30 and 120 psi. If your issue does occur, phone your utility business.

Linking to water line:

1. Disconnect ice box or disconnect energy.

Turn OFF main water supply. Switch on nearest tap very very very long

sufficient to line that is clear of.

water pipe nearby the ice box.

Horizontal pipeline will be able to work, however the procedure that is following

needs to be followed: Drill from the side that is top of pipeline, not underneath. This may help in keeping water far from the drill. And also this keeps sediment that is normal collecting into the valve.

To look for the duration of copper tubing you will need,

measure from connection on reduced rear that is left of to

water pipe. Include 7 ft. (2.1 m) to accommodate going fridge for cleansing. Utilize 14 in. (6.35 mm) O.D. (outside diameter)

copper tubing. Make sure both ends of copper tubing are cut square.

Employing a grounded drill, drill a 14 in. gap when you look at the chilled water pipeline

you have got chosen.

1. Chilled Water Pipe

2. Pipe Clamp

3. Copper Tubing

4. Compression Nut

5. Compression Sleeve

6. Shut-Off Valve

7. Packing Nut

Fasten shut-off valve to cool water pipeline with pipeline clamp. Be

yes socket end is sturdily into the 14 in. drilled gap within the water

pipeline and therefore washer is beneath the pipeline clamp. Tighten packing nut. Tighten the pipeline clamp screws very very carefully and

evenly so washer makes a watertight seal. Try not to overtighten or you might crush the copper tubing, particularly if soft (coiled) copper tubing is employed. So Now you are quite ready to connect the copper tubing.

Slide compression nut on copper tubing as shown. Insert end of tubing into socket end squarely so far as it shall get. Screw compression nut onto socket end with adjustable wrench. Usually do not overtighten.

Spot the end that is free of tubing as a container or sink, and

switch on water that is main and flush out tubing until water is obvious. Turn fully off shut-off valve in the water pipeline. Coil copper tubing.

Linking to ice box:

1. Connect the copper tube towards the valve inlet employing a compression

Sleeve and nut as shown. Fasten the compression nut. Don’t overtighten. Utilize the pipe clamp regarding the relative straight back associated with

fridge to secure the tubing to your refrigerator as shown. This can assist in preventing harm to the tubing as soon as the fridge is pressed right right right back up against the wall surface. Go on to step two.

2. Turn shut-off valve ON. Look for leakages.

connections (including connections during the valve) or pea pea nuts that

Copper Tubing

3. Compression Nut

4. Valve Inlet

The ice manufacturer comes with a water strainer that is built-in. If

regional water conditions need regular cleansing or even a well is

your supply of water supply, a water strainer should that is second

be set up within the

in. (6.35 mm) water line. Get yourself a water

strainer from your https://besthookupwebsites.net/chat-hour-review/ appiiance dealer that is nearest. Install at either pipe connection.

Esta web utiliza cookies propias para su correcto funcionamiento. Al hacer clic en el botón Aceptar, acepta el uso de estas tecnologías y el procesamiento de sus datos para estos propósitos. Ver
Privacidad